MIL-L-80061B
Nomenclature
Manufacturer's name
Manufacturer's model designation
Manufacturer's serial number
Power input (volts, total amps, phase, frequency)
Contract number or order number
National stock number or plant equipment code
Date of manufacture
3.14 Technical data.
Technical data shall be furnished as specified
(see 6.2.2).
3.15 Workmanship. Workmanship of the machine and accessories shall be of
a quality equal to that of the manufacturer's commercial equipment of the
type specified herein.
4.1 Responsibility for inspection.
Unless otherwise specified in the con-
tract, the contractor is responsible for the performance of all inspection
requirements as specified herein. Except as otherwise specified in the contract,
the contractor may use his own or any other facilities suitable for the
performance of the inspection requirements specified herein, unless disapproved
by the Government. The Government reserves the right to perform any of the
inspections set forth in the specification where such inspections are deemed
necessary to assure supplies and services conform to prescribed requirements.
4.2 First article inspection. When first article approval is required under
3.1, first article inspection shall be per formed. Unless otherwise specified
(see 6.2.1), first article inspection shall comprise the examination in 4.4,
and all tests in 4.5. Failure to pass the examination or any test shall be
cause for disapproval of the first article.
4.3 Quality conformance inspection. Quality conformance inspection shall be
applied to each item prior to being offered for acceptance under the contract.
Unless otherwise specified (see 6.2.1) , quality conformance inspection shall
consist of the examination in 4.4, the test in 4.5.1, and the inspection in 4.6.
Failure of an item to pass any examination or test shall be cause for rejection.
4.4 Examination. The machine and equipment shall be examined for compliance
with theequipments of this specification in 3.2 throught 3.5 and 3.8 through
3.15.
4.5 Tests.
4.5.1 Performance test. The machine shall be operated in accordance with the
builder's standard procedure for warm-up and run-off checks. Proper operation
of all controls, motors, adjusting mechanisms and accessories shall be verified
during the trial period.